PROJECT
SHOWCASE

Pace Bus Administration Building

Arlington Heights, IL

Project delivered by Nicholas & Associates

Client: Pace Bus
Architect: Muller & Muller
Completed: 2009

Demolition and removal of an existing slab and foundation and construction of a new 65,000 square foot, two-story building with a steel frame and architectural precast concrete wall panels with aluminum storefront systems with insulated glazing panels. Steel structure designed for a future third floor. Project designed to comply with a Certification Level according to the US Green Building Council’s LEED Rating System.

CONTACT NICHOLAS & ASSOCIATES TODAY AND LET'S BUILD YOUR DREAM TOGETHER
847.394.6200